| | | Name: | | ProjectSimple | | | | Version: | | 1.0.0.130 | | | | Publisher: | | Adept | | |
| The following prerequisites are required: | | |
- .NET Framework 2.0 (x86)
- Windows Installer 3.1
- .NET Framework 3.5 SP1
| |
If these components are already installed, you can launch the application now. Otherwise, click the button below to install the prerequisites and run the application.
| | |
|
|